Working in a group of 4, work is distributed equally with Me and Steven doing the drawings while Kuaibing and Sachi do the report. Work during the first few week were going slow as the information and measurements gathered on site was messed up. We had no choice but to return to the site again and again until we gathered enough information.
During the last few days before the submission, one of our group members couldn't produce the report as she was not feeling well. To solve the problem, we redistribute the work with me doing the measured drawings while Steven and Sachi do the report.
As the submission date was close, and we were rushing to finish everything on time, We helped each other with the work. While Steven was helping me out with the drawings, I also contributed in report writing which includes the vegetation, and caption writing.
As Kuai Bing was feeling better, she also helped me out with the drawings before submission.
Below will be the measured drawings produced for the assignment.
Ground Floor Plan
Mezzanine Floor Plan
Section A-A
Section B-B
Front Elevation
No comments:
Post a Comment